  • A crawler dozer with a universal blade is to be used in a slot-dozing operation. The material is a dry, noncohesive silty sand, and is to be moved a distance of 350 ft from the beginning of the cut. The dozing is downhill on a 10% grade. The operator will have average skill, the dozer has a power-shift transmission, and both visibility.
  • Equipped with remote control, teleoperated, or fully autonomous dozers, operators can now safely and efficiently perform critical and sometimes dangerous mining tasks such as slot dozing, leach pad clearance, and ripping.
  • Start dozing from the front of the dozing zone. As seen from the picture, if working on level ground, dozing should start at the front. This reduces the distance that material must be pushed. The dozers blade is also always full by using a downward grade.

Equipped with remote control, teleoperated, or fully autonomous dozers, operators can now safely and efficiently perform critical and sometimes dangerous mining tasks such as slot dozing, leach pad clearance, and ripping.


Bulldozing

Bulldozing (drifting) is the process of pushing materials straight ahead in front of the dozer blade. Bulldozing is most efficient when the blade pushes as much material as possible, as shown in figure 11-25. The maximum working distance for dozer production depends on the speed and blade capacity of the dozer. However, the maximum working distance is usually 200 to 500 feet with 300 feet being normal for a medium-size dozer.

To maximize the amount of material pushed, push downhill whenever possible. With the assistance of gravity, a bulldozer can push a far greater load downhill than on a level grade. When you are dozing down a steep hill, a separate full-length pass with each load is unnecessary; instead, push and pile several loads at the brink of the hill and push them all to the bottom in a single pass.

Ocasio cortez makeup. Figure 11-25.-Bulldozing.

Figure 11-26.-Side-by-side dozing.

Figure 11-27.-Slot dozing.

Side-by-side dozing (fig. 11-26) and slot dozing (fig. 11-27) maximize the amount of earth drifted by reducing or preventing spillage around the outer edges of the blade.

SIDE-BY-SIDE DOZING.- In side-by-side dozing, two dozers work abreast with blade edges as close together as possible, preventing spillage around one blade edge on each dozer. Side-by-side dozing requires time-consuming maneuvering of the dozers; therefore, it is impractical for hauls of less than 50 feet and more than 300 feet.

SLOT DOZING.- Slot dozing is done by first building a pair of windrows with the spillage of several passes. As shown in figure 11-27, the windrows serve as barriers to prevent spillage around the dozer blade ends. Under favorable conditions, slot dozing can increase production up to 50 percent.

Figure 11-28.-Spreading.

Figure 11-29.-Culvert backfilling.

SPREADING.- Dozers are ideal for spreading fill material brought in by haul units (fig, 11-28). Position the blade in a straight position, so the material is drifted directly under the cutting edge.

BACKFILLING.- Backfilling is the process of replacing excavated earth, as shown in figure 11-29. When a culvert is backfilled, the dozer should not cross the culvert unless there is at least 12 inches of compacted material on top of the culvert. If a bulldozer is used to bacfill a culvert, the best method is to make diagonal passes over the material, ending each pass with a swing that brings the blade in line with the culvert.

The angle blade is preferred for bacfilling a trench, because material can be side cast into the trench while maintaining a steady forward motion, as shown in figure 11-30.

Figure 11-30.Trench backfilling.

When a pipe trench is bacfilled, fine material is placed around the pipe and coarse material above it, so the pipe is supported by well-compacted material. However, covering the pipe to full depth in short lengths may concentrate weight and break pipe joints; therefore, cover the pipe in successive layers, rather than all at once.

NOTE: Be careful in pipe trench bacfilling to avoid dropping large rocks directly on the pipe. Youtube slots windy city slots.

FINISHING.- Whether clearing or spreading material on a roadbed, no job is completed until it has been smoothed and drainage is established. This is called finishing and should be done at the end of each Shift.

Blade the job lightly with about a half of a blade of dirt. This fills in any low spots or holes. Leave a windrow on the side that you are working toward. At the start of the next pass, cover half the blade width. Continue in this fashion over the project or section of the project you have worked that day before you shut down for the day. Finishing the project in this manner supports drainage and prevents having to walk over piles of dirt or through mudholes.




Privacy Statement - Copyright Information. - Contact Us

Comment Jpaydirt: More expensive to haul away than to bury,

By burying them I generate dirt to cover the solid rock, only a certain amount of rock is removable with out blasting,

Slot Dozing

this one was to high to cover with out removing as much rock as possible, most of the time I just skim up the loose rock with the.

scraper and take it back to where I am getting the dirt to cover them, this one had too big of rock to do that,

watch my video '637 triple scrapers get a rider' and go to the 4:30 mark, you will see how we cover them with scrapers,

Slot Dozing Adalah

Also watch 'Diamond T' in this one we haul away rock with a truck because the dirt is not deep enough to bury them and we couldn't pick them up with the scrapers because the farmer .

Dozing

over many years had dumped rock from the field onto the solid rock outcroppings and they were in piles to big to crawl over,

Slot Dozing Technique

they also had metal T posts and other tire destroying iron. some farmers don't want ugly piles of rock laying around,

Dozers Moving Dirt

so we do what they want, customer is always right yes?





broken image